realizations

Our latest achievements

Follow on the Instagram channel Tecnoterm our latest achievements, projects and workmanship.

A new 4500 sqm economizer in AISI 304 was delivered today in Le Havre (France).
Work in progress
Delivered to Aquafil Slovenia.HRSG plant with 35 t/h of steam at 10 barg and 250°C, with post-firing and fresh-air with automatic changeover. Heat recovery on Turbogas Kawasaki GPB80D.
MS Packaging Salerno HRSG RE-VAP TA 12/18 Eco2 Recovery Steam Generator
Mater biotech - Adria-Gas turbine: T70 Boiler: RE - VAP 16 / 20 / ECO / PF / FASteam production: 16 ton/h Design pressure: 20 barg Operation pressure: 15 barg
INVERNIZZI Spa - Cr-Thermal oil recovery system on process flue gas Capacity 5 MW Design temperature 300/250°C Design pressure 12 bar
Mesola paper millTurbine: T70 Boiler: RE-VAP 15 / 15 / ECOPower:15 TON/h Stamp pressure: 15 barg Operating pressure: 11 barg
PILKINTON Vasto - CH
DIATHERMIC OIL GENERATOR - OD-H Series